FEATURED PROJECT
Muhit Tunnel – Deep Supported Excavation
Location
Baghdad, Iraq
Client
Confidential
Project Overview
Design of the deep supported excavation for the Muhit Tunnel, reaching a maximum excavation depth of approximately 10 m.
Our Approach
The scope covered secant / shoring pile walls, a multi-level steel strut system, and numerical modelling to verify wall performance and ground movements.
Services Delivered
- Deep Supported Excavation Design
- Secant / Shoring Pile Wall Design
- Multi-Level Steel Strut System Design
- Numerical Modelling & Verification
Want results like this?
Reach out to our team to discuss how we can support your next project.
Start a Conversation