Muhit Tunnel – Deep Supported Excavation

Location

Baghdad, Iraq

Client

Confidential

Project Overview

Design of the deep supported excavation for the Muhit Tunnel, reaching a maximum excavation depth of approximately 10 m.

Our Approach

The scope covered secant / shoring pile walls, a multi-level steel strut system, and numerical modelling to verify wall performance and ground movements.

Services Delivered

  • Deep Supported Excavation Design
  • Secant / Shoring Pile Wall Design
  • Multi-Level Steel Strut System Design
  • Numerical Modelling & Verification